| DATE | INV | Work Done | RTU | $ |
|---|---|---|---|---|
| 12/20/2023 | PR23239 | 12-7-2023 Inspect and service 4 Trane RTUs on Younkers suite at Rivertown mall. Upon inspection of units 2,3,5, & 7 found 3 failed hot surface ignitors and 1 blown fuse on RTU #3 Replaced all failed hot surface ignitors with new. Checked condition of belts and filters. Verified operation of each unit. |
2,3,5,7 | $1,252.31 |
| 6/13/2025 | 2848 | Replace stage #1 and stage #2 contactors on RTU #5. Reference GRIPS quote number 1456. | 5 | $585.00 |
| 1/12/2026 | 3797 | 1. Replace two combustion blower motors on Trane RTU #5. 2. Remove old inducer motors. 3. Clean mounting surfaces. 4. Install new inducer motors. 5. Clean up wiring. 6. Verify proper operation of new inducer motors. 7. Inspect and repair any additional issues found during installation. 1. Installed both new inducer motors on rooftop unit #5. 2. Removed the old inducers and cleaned the mounting surfaces. 3. Cleaned up the wiring and verified that each new inducer motor was working properly. 4. Noticed a broken and loose wire spade for burner 1 gas valve main; replaced it with a new female connector. 5. Verified that both burners lit and observed the unit running properly. |
5 | $3,222.38 |
| 1/9/2026 | 3713 | 1. Inspect and diagnose multiple units down with no heat. 2. Replace igniters on Rtu 5. 3. Inspect and diagnose issues with Rtu 6 heat exchanger and inducer motor. 4. Obtain quote for replacement parts from Trane. Resolution: 1. Inspected Rtu 7 and confirmed both stages of heat are running. 2. Diagnosed Rtu 5 and identified the need for two new igniters. 3. Replaced igniter on Trane Rtu 5 and observed the unit lighting. 4. Diagnosed Rtu 5 inducer motor as locked up and obtained a quote from Trane for replacement. 5. Diagnosed Rtu 6 heat exchanger and inducer motor issues, noting the heat exchanger needs replacement and the inducer motor sounds rough. |
5, 6, 7 | $938.86 |
RTU 2,3,5,7
12-7-2023 Inspect and service 4 Trane RTUs on Younkers suite at Rivertown mall. Upon
inspection of units 2,3,5, & 7 found 3 failed hot surface ignitors and 1 blown fuse on RTU #3
Replaced all failed hot surface ignitors with new. Checked condition of belts and filters.
Verified operation of each unit.
inspection of units 2,3,5, & 7 found 3 failed hot surface ignitors and 1 blown fuse on RTU #3
Replaced all failed hot surface ignitors with new. Checked condition of belts and filters.
Verified operation of each unit.
RTU 5
Replace stage #1 and stage #2 contactors on RTU #5. Reference GRIPS quote number 1456.
RTU 5
1. Replace two combustion blower motors on Trane RTU #5.
2. Remove old inducer motors.
3. Clean mounting surfaces.
4. Install new inducer motors.
5. Clean up wiring.
6. Verify proper operation of new inducer motors.
7. Inspect and repair any additional issues found during installation.
1. Installed both new inducer motors on rooftop unit #5.
2. Removed the old inducers and cleaned the mounting surfaces.
3. Cleaned up the wiring and verified that each new inducer motor was working properly.
4. Noticed a broken and loose wire spade for burner 1 gas valve main; replaced it with a new female connector.
5. Verified that both burners lit and observed the unit running properly.
2. Remove old inducer motors.
3. Clean mounting surfaces.
4. Install new inducer motors.
5. Clean up wiring.
6. Verify proper operation of new inducer motors.
7. Inspect and repair any additional issues found during installation.
1. Installed both new inducer motors on rooftop unit #5.
2. Removed the old inducers and cleaned the mounting surfaces.
3. Cleaned up the wiring and verified that each new inducer motor was working properly.
4. Noticed a broken and loose wire spade for burner 1 gas valve main; replaced it with a new female connector.
5. Verified that both burners lit and observed the unit running properly.
RTU 5, 6, 7
1. Inspect and diagnose multiple units down with no heat.
2. Replace igniters on Rtu 5.
3. Inspect and diagnose issues with Rtu 6 heat exchanger and inducer motor.
4. Obtain quote for replacement parts from Trane.
Resolution:
1. Inspected Rtu 7 and confirmed both stages of heat are running.
2. Diagnosed Rtu 5 and identified the need for two new igniters.
3. Replaced igniter on Trane Rtu 5 and observed the unit lighting.
4. Diagnosed Rtu 5 inducer motor as locked up and obtained a quote from Trane for replacement.
5. Diagnosed Rtu 6 heat exchanger and inducer motor issues, noting the heat exchanger needs replacement and the inducer motor sounds rough.
2. Replace igniters on Rtu 5.
3. Inspect and diagnose issues with Rtu 6 heat exchanger and inducer motor.
4. Obtain quote for replacement parts from Trane.
Resolution:
1. Inspected Rtu 7 and confirmed both stages of heat are running.
2. Diagnosed Rtu 5 and identified the need for two new igniters.
3. Replaced igniter on Trane Rtu 5 and observed the unit lighting.
4. Diagnosed Rtu 5 inducer motor as locked up and obtained a quote from Trane for replacement.
5. Diagnosed Rtu 6 heat exchanger and inducer motor issues, noting the heat exchanger needs replacement and the inducer motor sounds rough.